The profitability of an investment begins well before the exploitation, one speaks then of optimization of the realization. Installation work must not exceed the planned deadlines, and the energy spent and disbursed must be rationalized. Good planning is not enough on its own; site management must then be mastered in order to avoid overflows. The purpose of scheduling and coordinating operations is to optimize time and eliminate the redundancy of tasks between the different trades.
Providing a solution is not just about providing an assortment of components. We create the ideal conditions to give you complete peace of mind. It is for you the assurance of having at your disposal with a dynamic and reactive interlocutor who will know how to meet your expectations by a strong dynamism and quality services. thanks to our project management methodology based on 8 steps:
Engineering
Programming
Technical schematization
Configuration management
Systems integration
Supply [Procurment]
Equipments
Devices
Cables
Accessories
Mastery
Implementation
Settings
Project management
Scheduling
Site management
Conduct of works
Coordination of operations
Establishment
Installation
Wiring
Log in
Connection
Fixation
Validation and verification
Unit tests
System test
Integration test
Tests / Simulation
Commissioning [Commissioning]
Start-up